Work Centres

Work Centres

Work Centres are the places on your shop floor where operations happen — cutting, assembly, finishing, packing. Every component on a bill of materials is assigned to one, which is how the system knows where each part of a job is carried out.

Where to find it

Go to Manufacturing > Settings > Work Centers.

Features

ElementDescription
NameThe work centre's identifier, and what appears on BOM lines.
DescriptionIts purpose, or the operations carried out there.
EditThe pencil icon — change the name or description.
DeleteThe red X. Irreversible, so use it with care.
Add NewOpens a form for a new work centre.
Show also InactiveIncludes retired work centres in the list.

Usage

Adding a new work centre

  1. Click Add new.
  2. Fill in the Name and Description.
  3. Click Save.

Editing an existing work centre

  1. Click the pencil icon beside it.
  2. Change the fields you need.
  3. Click Save.

Deleting a work centre

  1. Click the red X beside it.
  2. Confirm when prompted.

Viewing inactive work centres

Tick Show also Inactive to include ones no longer in use.

Deactivate rather than delete a work centre that has history behind it. Deleting removes it from the list while past BOM lines still refer to it; marking it inactive hides it from new work without disturbing what has already been recorded.

How to name them

Name work centres after the operation rather than the room — "Cutting" and "Finishing" stay meaningful when the floor is rearranged, "Bay 3" does not.

Related pages

Global Coverage

Multi-Country ERP — One Platform

Supports GST (India), VAT (UAE, South Africa, Egypt, Iraq, Botswana), and local compliance across all regions.

🇮🇳 India (GST)
🇦🇪 UAE (VAT)
🇸🇦 Saudi Arabia
🇶🇦 Qatar
🇧🇭 Bahrain
🇴🇲 Oman
🇰🇼 Kuwait
🇪🇬 Egypt
🇮🇶 Iraq
🇿🇦 South Africa
🇧🇼 Botswana
🇲🇾 Malaysia
🇸🇬 Singapore
🇦🇺 Australia
🇬🇧 United Kingdom
🇺🇸 USA
🌏 & More Regions